Ministry Of Agriculture Jabal Akdar Nizwa, Oman 21-23 of May 2015
We start this fumigation by conducting inspection in the whole building. Sealing all electronics equipment like Exhaust Fan, A/C, Electrical outlet. We also seal windows, Door, hole and other different gaps we saw while we conduct the inspection. This process is to make sure that the building is free of any possible leakage to achieved successful fumigation. Building fumigation with 1000 PPM target concentration. 62 kgs of Eco2fume fumigant gas 890 cubic meter (M3) building.
- Plastic sheet
- Packaging tape
- Seal foam
- Heave duty tape
- Weighing Scale
- Wrench
- Cutter
- Eco2fume Fumigant gas
- Monitoring Machine (Drager 2000)
- Personal Protective Equipment